+- +-

+-User

Welcome, Guest.
Please login or register.
 
 
 

Login with your social network

Forgot your password?

+-Stats ezBlock

Members
Total Members: 48
Latest: watcher
New This Month: 0
New This Week: 0
New Today: 0
Stats
Total Posts: 16867
Total Topics: 271
Most Online Today: 121
Most Online Ever: 1208
(March 28, 2024, 07:28:27 am)
Users Online
Members: 0
Guests: 87
Total: 87

Author Topic: Wind Power  (Read 27086 times)

0 Members and 2 Guests are viewing this topic.

AGelbert

  • Administrator
  • Hero Member
  • *****
  • Posts: 36274
  • Location: Colchester, Vermont
    • Renwable Revolution
Spain’s First Offshore Wind Turbine Inaugurated
« on: October 23, 2013, 02:37:29 pm »
Spain’s First Offshore Wind Turbine Inaugurated

Gamesa G97 Model Wind Turbine

The first offshore wind turbine for wind energy company Gamesa and for the host-country Spain was inaugurated on Monday, in in Arinaga Quay (Gran Canary Island). The ceremony was attended by the President of the Canary Islands regional government, Paulino Rivero, the Minister for Industry, Energy and Tourism, José Manuel Soria, and the Chairman of Gamesa, Ignacio Martín.

The 5 MW 154 meter-tall turbine has a rotor diameter of 128 meters, sporting 62.5 meter-long blades, all combining to produce enough energy to supply 7,500 Canary Island homes with clean energy.

Gamesa is noticeably excited about their entrance into the offshore wind market, proclaiming that “Gamesa’s platform is set to become a benchmark in the sector thanks to the low cost of energy it offers customers.”

They were equally proud of the fact that the turbine parts were all made in Spain, noting however that “teams from all over the world participated in the product’s design and development phases”, including:

•The blades, each of which measures 62.5m long and weighs 15 tonnes, making them the longest ever produced and transported in Spain and among the longest in Europe, were made at the factory in Aoiz (Navarre)

•The nacelle, which measures over 12.5m long, 4m tall and 4m wide and weighs 72 tonnes, was made in Tauste (Zaragoza)

•The tower, which stretches nearly 90m high, was made by Windar (a joint venture between Gamesa and Daniel Alonso)

•The electric parts were made in Lerma (power train), Benissano (electric control cabinets), Coslada (converters) and Reinosa (generator)

Spain is one of the world’s largest wind energy producers in the world, and leveraging their extended coastline to further their dominant role in the industry will see enormous benefits for country and industry alike.

http://cleantechnica.com/2013/10/23/spains-first-offshore-wind-turbine-inaugurated/#jl04gKOJ0pumbj8W.99
« Last Edit: March 27, 2022, 04:16:51 pm by AGelbert »
He that loveth father or mother more than me is not worthy of me: and he that loveth son or daughter more than me is not worthy of me. Matt 10:37

 

+-Recent Topics

Future Earth by AGelbert
March 30, 2022, 12:39:42 pm

Key Historical Events ...THAT YOU MAY HAVE NEVER HEARD OF by AGelbert
March 29, 2022, 08:20:56 pm

The Big Picture of Renewable Energy Growth by AGelbert
March 28, 2022, 01:12:42 pm

Electric Vehicles by AGelbert
March 27, 2022, 02:27:28 pm

Heat Pumps by AGelbert
March 26, 2022, 03:54:43 pm

Defending Wildlife by AGelbert
March 25, 2022, 02:04:23 pm

The Koch Brothers Exposed! by AGelbert
March 25, 2022, 01:26:11 pm

Corruption in Government by AGelbert
March 25, 2022, 12:46:08 pm

Books and Audio Books that may interest you 🧐 by AGelbert
March 24, 2022, 04:28:56 pm

COVID-19 🏴☠️ Pandemic by AGelbert
March 23, 2022, 12:14:36 pm