AGelbert

  • Administrator
  • Hero Member
  • *****
  • Posts: 33188
  • Location: Colchester, Vermont
    • Renwable Revolution
Re: Wind Power
« Reply #255 on: September 27, 2018, 01:08:24 pm »
Chartwell Marine launches new vessel for U.S. offshore wind

By Michelle Froese | September 25, 2018

Chartwell Marine, a pioneer in next-generation vessel design, has announced the launch of the Chartwell 24, a brand-new crew-transfer vessel (CTV) design for the international offshore wind markets. The catamaran design has been developed in conjunction with CTV operators, wind-farm owners and turbine manufacturers, responding directly to lessons learned in the construction and long-term operations & maintenance (O&M) phases of European projects.


Chartwell 24 transfer vessel

The Chartwell 24 transfer vessel is capable of carrying a crew of 24 workers. It has been built with a focus on ergonomics and safety, with features such as extra handrails and safety sliding rails. View its specs here.

While the optimum composition of an offshore wind fleet remains a topic of debate, CTVs continue to play a critical role throughout development and operations. This role has evolved in line with the increasing demands of supporting large-scale deep-water wind farms, encompassing not only the safe, comfortable, and expedient transfer of technicians to and from the turbines, but also a wide range of essential logistical support activities that keep a project running on schedule.

In this context, CTVs and their operators must offer considerable versatility, while maintaining the highest possible standards of safety and technical availability. As the industry looks to balance these objectives, vessel designs are becoming increasingly standardized – but there is still room to refine this formula. In turn, operators in new markets such as the USA and Taiwan have the opportunity to start on the front foot by taking advantage of the most advanced vessel technology available.

The Chartwell 24, developed off the back of 10 years of data and experience in offshore wind vessel design, aims to hit a ‘sweet spot’ in vessel size and capability that has been achieved by the most effective vessels currently operating in the European market. It aims to build on those proven capabilities, while responding to new requirements emerging as the offshore wind industry expands worldwide.

Specifically, the vessel, which is capable of carrying 24 industrial personnel alongside 3 to 6 crew, also boasts the largest CTV foredeck in the market, enhancing its cargo capacity. With four engines – and options for hybrid propulsion – the Chartwell 24 enables power sharing, enhancing efficiency and adding redundancy that maximizes vessel reliability and availability. As scrutiny grows on vessel emissions worldwide, this also means that the vessel is well-placed to meet international requirements, such as EPA Tier 4 and IMO Tier 3.

“With the Chartwell 24, we’re responding directly to tried and tested vessel support approaches adopted throughout Europe, taking and building upon the best of proven designs and equipping international operators and wind-farm owners with a boat that is built for purpose, and meets their needs from day one,” said Andy Page, Managing Director, Chartwell Marine.

Crucially, the Chartwell 24 introduces a number of safety related innovations, including a step-free deck that almost entirely eliminates trip hazards, and purpose designed walkways with handrails and sliding safety rails positioned for safe, effective and repeatable crew transfer. From an operational perspective, skippers benefit from full all-round visibility, uncompromized by deck cargo.

“For crews and wind farm technicians, that will translate into a high degree of safety, comfort and operational familiarity. For CTV operators and project owners, that will result in incremental gains in efficiency, availability and reliability that ultimately improve the way offshore wind farms are constructed and operated.”

https://www.windpowerengineering.com/business-news-projects/chartwell-marine-launches-new-vessel-for-u-s-offshore-wind/
Rob not the poor, because he is poor: neither oppress the afflicted in the gate:
For the Lord will plead their cause, and spoil the soul of those that spoiled them. Pr. 22:22-23

 

+-Recent Topics

Wind Power by AGelbert
July 23, 2021, 04:22:19 pm

Sustainable Cities by AGelbert
July 23, 2021, 01:15:48 pm

U.S State Politics by AGelbert
July 22, 2021, 03:22:33 pm

Special Sensory Perception by AGelbert
July 22, 2021, 02:01:15 pm

Photvoltaics (PV) by AGelbert
July 22, 2021, 12:33:40 pm

Renewable Hydrogen Power by AGelbert
July 21, 2021, 03:56:14 pm

🚩 Global Climate Chaos ☠️ by AGelbert
July 21, 2021, 02:50:36 pm

Batteries by AGelbert
July 21, 2021, 02:19:27 pm

Pollution by AGelbert
July 21, 2021, 01:45:16 pm

The Big Picture of Renewable Energy Growth by AGelbert
July 21, 2021, 01:40:52 pm