+- +-

+-User

Welcome, Guest.
Please login or register.
 
 
 
Forgot your password?

+-Stats ezBlock

Members
Total Members: 39
Latest: robbrogers
New This Month: 1
New This Week: 0
New Today: 0
Stats
Total Posts: 7589
Total Topics: 220
Most Online Today: 15
Most Online Ever: 48
(June 03, 2014, 03:09:30 am)
Users Online
Members: 0
Guests: 1
Total: 1

Author Topic: Wind Power  (Read 8884 times)

0 Members and 0 Guests are viewing this topic.

AGelbert

  • Administrator
  • Hero Member
  • *****
  • Posts: 7419
  • Location: Colchester, Vermont
    • View Profile
    • Agelbert Truth AND Consequences
Re: Wind Power
« Reply #195 on: June 30, 2017, 07:03:36 pm »
Agelbert NOTE: Oh the irony!   



First US Offshore Wind Installation Vessel to be Built with Oil and Gas Expertise  :o  ;D

Expected delivery of the Jone-Act-compliant vessel is late 2018.

June 30, 2017

By Jennifer Runyon Chief Editor

SNIPPET:

The vessel will be based on a US-built barge. Zentech plans to install four truss legs with spud cans, a proven oil and gas design, and integrate them into a newly built hull.

In late 2016, the first U.S. offshore wind farm was commissioned off the coast of Rhode Island. In constructing the Block Island Wind Farm, developer Deepwater Wind had to use a wind turbine installation vessel —Fred Olsen Windcarrier’s Brave Tern — from Europe because no boat big enough to install the vessels existed yet in the United States. Because of U.S. regulations in the Jones Act, Brave Tern was not permitted to touch the shore , meaning that other U.S.-flagged vessels had to transport equipment from the U.S. coast to the installation site, adding additional cost to the installation of the project.  >:(

The Zentech and RRI vessel will solve that logistical headache. The company said that the vessel will also act as an oil and gas crane jack-up for decommissioning in 300-ft water depths when not in service for installing and/or maintaining wind turbines.

Design of the Jones Act vessel should allow it to navigate the New Bedford Hurricane Barrier, the company said. It will be able to carry and install components for at least three complete turbines, up to 9-MW capacity  , according to the company. The vessel’s jacking system will be rated at a capacity of 16,000 tons, extending the unit’s service life.

The company said that the vessel may one day be able to install four 8-MW fully assembled wind turbines and will be ready for anticipated 10-MW capacity machines in the future.

“With larger scale offshore wind projects following Block Island, the U.S. market requires forward-looking marine logistics,” said Andy Geissbuehler, Managing Partner of Renewable Resource International.

http://www.renewableenergyworld.com/articles/2017/06/first-jones-act-compliant-us-offshore-wind-jack-up-installation-vessel-to-be-built-with-oil-and-gas-expertise.html

Leges         Sine    Moribus     Vanae   
Faith,
if it has not works, is dead, being alone.

 

Related Topics

  Subject / Started by Replies Last post
0 Replies
81 Views
Last post October 28, 2013, 01:15:53 am
by AGelbert
0 Replies
131 Views
Last post November 04, 2013, 02:42:33 pm
by AGelbert
0 Replies
455 Views
Last post June 03, 2014, 02:10:30 am
by AGelbert
1 Replies
93 Views
Last post July 09, 2014, 12:50:00 am
by AGelbert
0 Replies
111 Views
Last post September 18, 2014, 01:53:13 am
by AGelbert

+-Recent Topics

Profiles in Courage by AGelbert
August 22, 2017, 09:44:19 pm

Pollution by AGelbert
August 22, 2017, 08:44:58 pm

Batteries by AGelbert
August 21, 2017, 11:57:45 pm

Electric Vehicles by AGelbert
August 21, 2017, 11:51:00 pm

Sustainable Farming by AGelbert
August 21, 2017, 03:27:35 pm

Corruption in Government by AGelbert
August 21, 2017, 02:18:08 pm

Nuclear Insecurity Today by AGelbert
August 21, 2017, 01:51:57 pm

The Wisdom of the Books of the Bible by AGelbert
August 20, 2017, 06:23:41 pm

Apocalyptic Humor by AGelbert
August 19, 2017, 05:25:20 pm

Nuclear Poisoning of the Pacific by AGelbert
August 18, 2017, 11:19:26 pm

Free Web Hit Counter By CSS HTML Tutorial