+- +-

+-User

Welcome, Guest.
Please login or register.
 
 
 
Forgot your password?

+-Stats ezBlock

Members
Total Members: 53
Latest: Jesuscepsy
New This Month: 0
New This Week: 0
New Today: 0
Stats
Total Posts: 16222
Total Topics: 264
Most Online Today: 4
Most Online Ever: 201
(December 08, 2019, 11:34:38 pm)
Users Online
Members: 0
Guests: 0
Total: 0

Author Topic: Wind Power  (Read 18973 times)

0 Members and 0 Guests are viewing this topic.

AGelbert

  • Administrator
  • Hero Member
  • *****
  • Posts: 33007
  • Location: Colchester, Vermont
    • Renwable Revolution
Spain’s First Offshore Wind Turbine Inaugurated
« on: October 23, 2013, 02:37:29 pm »
Spain’s First Offshore Wind Turbine Inaugurated



The first offshore wind turbine for wind energy company Gamesa and for the host-country Spain was inaugurated on Monday, in in Arinaga Quay (Gran Canary Island). The ceremony was attended by the President of the Canary Islands regional government, Paulino Rivero, the Minister for Industry, Energy and Tourism, José Manuel Soria, and the Chairman of Gamesa, Ignacio Martín.

The 5 MW 154 meter-tall turbine has a rotor diameter of 128 meters, sporting 62.5 meter-long blades, all combining to produce enough energy to supply 7,500 Canary Island homes with clean energy.

Gamesa is noticeably excited about their entrance into the offshore wind market, proclaiming that “Gamesa’s platform is set to become a benchmark in the sector thanks to the low cost of energy it offers customers.”

They were equally proud of the fact that the turbine parts were all made in Spain, noting however that “teams from all over the world participated in the product’s design and development phases”, including:

•The blades, each of which measures 62.5m long and weighs 15 tonnes, making them the longest ever produced and transported in Spain and among the longest in Europe, were made at the factory in Aoiz (Navarre)

•The nacelle, which measures over 12.5m long, 4m tall and 4m wide and weighs 72 tonnes, was made in Tauste (Zaragoza)

•The tower, which stretches nearly 90m high, was made by Windar (a joint venture between Gamesa and Daniel Alonso)

•The electric parts were made in Lerma (power train), Benissano (electric control cabinets), Coslada (converters) and Reinosa (generator)

Spain is one of the world’s largest wind energy producers in the world, and leveraging their extended coastline to further their dominant role in the industry will see enormous benefits for country and industry alike.


http://cleantechnica.com/2013/10/23/spains-first-offshore-wind-turbine-inaugurated/#jl04gKOJ0pumbj8W.99
« Last Edit: October 23, 2013, 02:52:05 pm by AGelbert »
Rob not the poor, because he is poor: neither oppress the afflicted in the gate:
For the Lord will plead their cause, and spoil the soul of those that spoiled them. Pr. 22:22-23

 

+-Recent Topics

Experts Knew a Pandemic Was Coming. Here’s What They’re Worried About Next. by Surly1
May 12, 2020, 07:46:22 am

Doomstead Diner Daily by Surly1
May 12, 2020, 07:40:17 am

Profiles in Courage by AGelbert
May 09, 2020, 11:47:35 pm

Money by AGelbert
May 09, 2020, 11:27:30 pm

Creeping Police State by AGelbert
May 09, 2020, 10:35:38 pm

COVID-19 🏴☠️ Pandemic by AGelbert
May 09, 2020, 10:19:30 pm

Resisting Brainwashing Propaganda by AGelbert
May 09, 2020, 10:07:28 pm

Corruption in Government by AGelbert
May 09, 2020, 09:54:48 pm

🚩 Global Climate Chaos ☠️ by AGelbert
May 09, 2020, 09:10:24 pm

Intelligent Design by AGelbert
May 09, 2020, 06:38:41 pm