+-User

Welcome, Guest.
Please login or register.
 
 
 

Login with your social network

Forgot your password?

+-Stats ezBlock

Members
Total Members: 48
Latest: watcher
New This Month: 0
New This Week: 0
New Today: 0
Stats
Total Posts: 16867
Total Topics: 271
Most Online Today: 129
Most Online Ever: 1208
(March 28, 2024, 07:28:27 am)
Users Online
Members: 0
Guests: 92
Total: 92

Author Topic: Fossil Fuels: Degraded Democracy and Profit Over Planet Pollution  (Read 30786 times)

0 Members and 6 Guests are viewing this topic.

AGelbert

  • Administrator
  • Hero Member
  • *****
  • Posts: 36274
  • Location: Colchester, Vermont
    • Renwable Revolution
Agelbert NOTE: The story of a 7.5 billion dollar hole in the ground with a lot of liars on top.  >:(

How Lies, Greed, & Mismanagement Blew Up The “Clean Coal” Myth

March 5th, 2018 by Steve Hanley

SNIPPET:

Clean coal. It was supposed to be the alchemist’s dream, the real world equivalent of spinning straw into gold. Or making a silk purse from a sow’s ear, if you are a Linda Ronstadt fan. What clean coal is all about is taking lignite, the lowest grade of coal, often called brown coal, and putting it into a pressurized chamber, then heating it to 1800 degrees Fahrenheit under great pressure. The resulting gas is collected and used to make electricity, sequestering most of the carbon emissions from the lignite at the same time.

Carbon Capture Is The Key
Kemper clean (NOT) coal plant,

Kemper clean coal plant, If it worked, the clean coal and carbon capture process would not only make electricity, it would do so with the lowest carbon footprint of any fossil fuel, including natural gas. It would be a two-fer, a daily double, and a twin killing all rolled into one. The carbon capture piece of the puzzle is what attracted attention from people around the world, including Saudi Arabia, Japan, and Norway.

According to an article in The Guardian, Jukka Uosukainen, the United Nations director for the Climate Technology Center and Network, toured the site of the proposed plant in Kemper County, Mississippi in 2014 and said, “I’m impressed,” before adding, “Maybe using coal in the future is possible.”

Clean Coal Technology Fails — Big Time

The problem is, the clean coal technology, which was helped along by hundreds of millions of dollars in federal grants and research, doesn’t work. The problems started when the first of two high pressure, high temperature gasifier units arrived. During testing, moisture trapped in the concrete liner turned to steam and exploded, ruining the unit. No one had any realistic idea how to fix the problem.

Later, the 174-foot tall concrete sphere where the coal would be stored began to crack almost as soon as it was completed. Soon, there was a hole in the dome a large as small house. The entire structure had to be torn down and rebuilt. The original budget of around $2.5 billion arrived at a decade ago ballooned over time to more than $7.5 billion before the Southern Company called a halt to the project last year.

Lies And Deception Abound

But that’s not the real story. Not all new technologies are able to make the leap from the laboratory to the real world. What is really at issue here is the lies, double dealing, deliberate misrepresentations, and obfuscations carried out at the highest levels of the Southern Company with the aid of Mississippi officials. In America today, nuns protesting insane immigration policies get arrested and charged with crimes.  Officials involved in covering up a massive scandal that bilked stockholders and utility customers out of billions are allowed to retire quietly to their oceanside mansions. The United States has a legal system. What it lacks is any semblance of a justice system.

As the first concrete dome was being torn down and before it was rebuilt, Tom Fanning, CEO of Southern Company, was telling a bald faced lie to investors. During an April 24, 2013 earnings call he told them that “tremendous progress” was being made at the construction site and that “the scheduled in-service date” was feasible. He added that most of the key components for the facility — including the dome — were already “in place.” They were not.

Bureaucracy Fails

The Mississippi Public Service Commission was part of the problem as well. On March 15, 2012, the Mississippi supreme court ruled in favor of a petition by The Sierra Club to shut the project down. Shortly thereafter, the PSC renewed the company’s permission to build the plant, effectively bypassing the supreme court ruling. But it insisted on an absolutely final, no wiggle room, hard cap on the cost of the project of $2.8 billion. The company was way beyond that limit at the time. The next few years were taken up as much with cooking the books to keep the PSC in the dark as continuing construction on the Kemper plant.

The Guardian reviewed more than 5,000 pages of documents and e-mails in order to put its story together and we encourage you to read its entire exposé if  you want all the gory details. They also interviewed several current and former engineers who worked on the Kemper program. The story that unfolds details in exquisite detail the pressure put on those people to fudge the numbers to keep the state authorities from pulling the plug.

Lying From The Start

One of the key components to the clean coal plant — which would feature more than 900,000 feet of piping — was the availability rate, the percentage of the time it could be expected to be up and running versus down for maintenance and repairs. The Kemper facility needed to have an availability rate of 80% in order to be financially successful.

An independent audit requested and paid for by Southern Company just as construction was getting underway found the actual availability rate would be more in the range of 30% to 45% during the first 3 to 5 years of operation with the 80% figure not likely until at least 10 years out — if ever. Later, an internal review came to much the same conclusion. None of that information was shared with federal or state officials or investors. Instead, Southern Company employees were pressured to alter key documents to make it appear as thought things were moving along as planned.

Incentivizing Greed

A large part of the Kemper clean coal debacle involved the way utility companies earn their living. In many parts of the country, they are able to attract investors because they are guaranteed a designated rate of return on the investments they make in power generation facilities and infrastructure. Want to make more money? Spend more money. It’s easy. The law guarantees a fixed rate of return whether your investments are wise or not. Great for utility company executives and their generous compensation plans. Not so great for the members of the public who see their rates increase to cover the costs of those expansionist policies.

Mississippi and several of its neighboring states have only themselves to blame. Like giving free money to compulsive gamblers, they passed laws in the early years of this century that allowed utility companies to start earning their financial rewards before projects were even completed. This “I will gladly pay you Tuesday for a hamburger today” philosophy ratcheted up the incentives to spend big by Southern Company and other utilities.

Full article:

https://cleantechnica.com/2018/03/05/lies-greed-mismanagement-blew-clean-coal-myth/

Agelbert COMMENT:  These scam artists never stop doing what they do. Samuel Clemens (Mark Twain) once noted their mens rea modus operandi in regard to gold mines.
Quote
"A gold mine is a hole in the ground with a liar on top."

The "Carbon Capture" Technology is, and always will be, baloney. When they tell you a nuclear submarine can keep the atmosphere below 350 PPM of carbon dioxide, THEN, and ONLY then, can it be said that mankind has the carbon capture technology to keep us from becoming crispy critters from Catastrophic Climate Change.

At present, nuclear submarine CO2 scrubbing technology can achieve around 8,000 PPM of CO2 levels, and that for about six months, at which time they are forced to surface to keep the CO2 levels from harming the crew.

When the fossil fuelers tell you that carbon capture and sequestration is doable with present technology, please show them the following meter reading:


As if that wasn't enough to warrant a crash program to get back to 350 PPM of CO2, the methane bomb is orders of magnitude worse.

Eminent Russian Scientist Dr. Natalia Shakhova (International Arctic Research Center)
He that loveth father or mother more than me is not worthy of me: and he that loveth son or daughter more than me is not worthy of me. Matt 10:37

 

+-Recent Topics

Future Earth by AGelbert
March 30, 2022, 12:39:42 pm

Key Historical Events ...THAT YOU MAY HAVE NEVER HEARD OF by AGelbert
March 29, 2022, 08:20:56 pm

The Big Picture of Renewable Energy Growth by AGelbert
March 28, 2022, 01:12:42 pm

Electric Vehicles by AGelbert
March 27, 2022, 02:27:28 pm

Heat Pumps by AGelbert
March 26, 2022, 03:54:43 pm

Defending Wildlife by AGelbert
March 25, 2022, 02:04:23 pm

The Koch Brothers Exposed! by AGelbert
March 25, 2022, 01:26:11 pm

Corruption in Government by AGelbert
March 25, 2022, 12:46:08 pm

Books and Audio Books that may interest you 🧐 by AGelbert
March 24, 2022, 04:28:56 pm

COVID-19 🏴☠️ Pandemic by AGelbert
March 23, 2022, 12:14:36 pm